The steel fabrication and installation service for the steel structure of the Stack Biomass Boiler is provided by WCE’s Steel Fabrication Solution Business Unit (FSS). The process includes sourcing materials, specifically SUS316 stainless steel sheets, to fabricate the new steel structure for the Stack Biomass Boiler. Simultaneously, the old Stack Biomass Boiler is dismantled, and the newly fabricated and assembled steel structure is installed to replace it. The total duration of the project is 3 months.