• Project Name: Structural Reinforcement of Bogie Container Freight Car (The Prototype) Q'ty 1 Unit
  • Customer: State Railway of Thailand (SRT)
  • Description: Design: Develop a structural reinforcement design for the Bogie Container freight car (BCF), Model 112, with a capacity of 48 tons, to enable it to carry a load of 62 tons. Drawing Preparation: Prepare detailed modification drawings and submit them to the Mechanical Engineering Division of SRT for approval. Evaluation before modify: Conduct a thorough inspection before initiating repairs and structural reinforcement. Pre-Test: Perform load testing based on actual vertical load conditions as analyzed in Item 1, prior to commencing the modification work.  5.Implementation: Execute the structural reinforcement of the main frame in accordance with the approved design from SRT, Using newly specified materials.  Post-Test: Conduct load testing following completion of the modifications, based on actual vertical load conditions as analyzed in Item 4.  Delivery: Deliver the completed unit to the Napakhuang Station within 120 days.  Warranty: Provide a one-year warranty effective from the date of acceptance by the appointed inspection committee.

 

 

 

 

 

 

Contact Us

 

West Coast Engineering Company Limited (WCE)

🌐 www.wce.co.th

✉️ international@wce.co.th

📞 +66 (0) 65-9376283

 

Your Turn Key Engineering Solution 

We engineer your sucCEs

 

 

✉️

Purchasing Department : phaiboono@wce.co.th   |   Human Resources and Administration Department : hrmwce@wce.co.th   |   Sales Department : international@wce.co.th

Headquarters Bangkok

16 K&Y Building 5 Fl., Surasak Road, Silom Sub-District, Bangrak District, Bangkok, 10500
Mobile Phone +66 (06) 5937 6283 
Fax +66 (0) 2233 6669

Factory Bang Saphan

9/1 Moo 4, BanKlangNa – YaiPloy Road, Maeramphueng, BangSaphan, PrachuapKhiriKhan 77140
Telephone +66 (0) 3290 6112 – 119
Fax +66 (0) 3290 6120